PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Compacting around Monumental Stairs Facing East (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing East (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North (800x600).jpg Installing the Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg 023 (800x600).jpg 024 (800x600).jpg Backfill inside the radius at the Monumental Stairs Facing East (800x600).jpg
Previous pageNext page Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North (800x600)
Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North (800x600)